Decommission Your Data
Center Get Maximum
Value Securely.

We handle your data center or colo exit end-to-end. Our process is audit compliant, allows for de-rack, packout, data sanitization or destruction. With certified recycling, you get chain-of-custody, Certificates, and a clear ROI plan.

R2v3 compliance certification ISO 9001 quality assurance and management icon Environmental management system ISO 14001 icon image Workplace health and safety compliance ISO 45001 icon

Get a Free Quote


Replies in 1 business day • 1,200+ pickups • 4.9 ★

IT professional managing server rack with laptop

We offer a secure handoff from DC to disposition.

Single routed plan

We pick up, audit, de-rack, pack/label, transport, sanitize/destroy or resale/recycle.

Proof:

CoD, serial logs, chain-of-custody aligned to compliance.

ROI-first: We take care of your inventory.

Our team will separate reusable assets for liquidation providing you value recovery and recycle the rest responsibly.

Get a Decommissioning Quote →

How typical data decommission works

Discovery & audit:

rack map, serial plan, power/cooling dependencies

De-rack & packout:

labeled pallets/boxes; sealed bins for drives.

Data handling:

NIST 800-88 purge (with logs) or on-site/off-site destruction

Disposition:

Resale/liquidation of viable gear; R2v3 recycling for the rest.

Evidence pack:

CoD + serial log + chain-of-custody, optional photos/time stamps

Technician in white gloves repairing hard drives

You choose the method of liquidation
and decommission

Disassembled hard drive parts and internal circuits.

Purge for Reuse (NIST 800-88):

Verified wipes with serial logs; device remains
reusable; CoD available.

Computer circuit boards in plastic bins.

Physical Destruction

On-site shredding (witnessed) or off-site
destruction; CoD + serials + CoC.

Note: Mixed loads? We can split by method of decommission needed.

From pick up to data decommission documentation in 3 steps

Get a Decommissioning Quote
Abstract green hummingbird graphic to show sustainability.
Efficient electronics pickup symbol

Schedule

Fill the quote form, confirm racks, access rules, methods, and SLA window.

01
Visual boundary between steps.
Control sealed bins.

De-rack

We will pick up, provide a labeled packout with sealed media bins and track transfer.

02
Separator line for different steps.
Certified CoD and serial log documentation

Document

We offer an evidence pack + liquidation proceeds (if applicable).

03

Same-week in most metros; multi-site via Reverse Logistics

Make the data exit pay for itself

  • Labor/logistics quoted to scope; value recovery offsets net cost.
  • Transparent rates for non-redeemable items; R2v3 downstream.
Request an ROI Plan →
Worker in blue gloves assembling a laptop keyboard

Built for regulated and distributed
environments

Coverage: Nationwide same-week pick up in most metros
Business professional pointing with a question mark, representing expert guidance and consultation for secure data center decommissioning services.

Data Decommissioning FAQ

Yes, as a certified firm the access rules, change windows, and safety permits are built into the plan.

Request a Free Quote

Replies in 1 business day • 1,200+ pickups • 4.9 ★