{"id":4790,"date":"2026-10-20T14:34:00","date_gmt":"2026-10-20T14:34:00","guid":{"rendered":"https:\/\/hummingbirdinternational.net\/blog\/?p=4790"},"modified":"2026-10-21T13:39:45","modified_gmt":"2026-10-21T13:39:45","slug":"data-center-decommissioning-risk-assessment","status":"publish","type":"post","link":"https:\/\/hummingbirdinternational.net\/blog\/data-destruction-security\/data-center-decommissioning-risk-assessment\/","title":{"rendered":"Data Center Decommissioning Risk Assessment: 12 Things IT Teams Should Verify Before Removing Equipment"},"content":{"rendered":"<p>A data center decommissioning risk assessment identifies potential IT, security, asset, safety, and logistical risks before equipment is disconnected or removed. It verifies the asset inventory and documentation so the data center shutdown can proceed with accountability across all stages.<\/p>\n<p>The following 12-point assessment can be a good starting point for organizations planning a data center shutdown, consolidation, migration or infrastructure changes.<\/p>\n<div id=\"rtoc-mokuji-wrapper\" class=\"rtoc-mokuji-content frame3 preset1 animation-fade rtoc_open default\" data-id=\"4790\" data-theme=\"Hummingbird International LLC Blog Theme\">\n\t\t\t<div id=\"rtoc-mokuji-title\" class=\" rtoc_left\">\n\t\t\t<button class=\"rtoc_open_close rtoc_open\"><\/button>\n\t\t\t<span>Table of contents<\/span>\n\t\t\t<\/div><ul class=\"rtoc-mokuji mokuji_ul level-1\"><li class=\"rtoc-item\"><a href=\"#rtoc-1\">Why Risk Assessment is Important for Businesses?<\/a><ul class=\"rtoc-mokuji mokuji_ul level-2\"><li class=\"rtoc-item\"><a href=\"#rtoc-2\">Prevent Disruptions<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-3\">Protect Data Across Shutdown<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-4\">Asset Accountability<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-5\">Less Removal and Safety Risks<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-6\">Protect Asset Value<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-7\">Documentation from Scratch<\/a><\/li><\/ul><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-8\">12 Things IT Teams Should Verify Before Removing Equipment<\/a><ul class=\"rtoc-mokuji mokuji_ul level-2\"><li class=\"rtoc-item\"><a href=\"#rtoc-9\">1. Complete and Check IT Asset Inventory<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-10\">2. Identify Data\/Retention Requirements<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-11\">3. Verify Data Erasure and Sanitization<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-12\">4. Check Application and Infrastructure Dependencies<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-13\">5. Review Network Connectivity Dependencies<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-14\">6. Assess Power\/Cooling Infrastructure<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-15\">7. Verify Security and Access Controls<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-16\">8. Confirm Compliance or Regulatory Requirements<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-17\">9. Establish Asset Disposal and Chain-of-Custody Procedures<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-18\">10. Coordinate Vendors\/Third Parties<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-19\">11. Evaluate Business Continuity and Operational Risks<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-20\">12. Complete Final Inspection and Sign-Off<\/a><\/li><\/ul><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-21\">Work on Your Data Center Decommissioning<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-22\">Frequently Asked Questions (FAQs)<\/a><ul class=\"rtoc-mokuji mokuji_ul level-2\"><li class=\"rtoc-item\"><a href=\"#rtoc-23\">1. What is a data center decommissioning risk assessment?<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-24\">2. Why is data sanitization important before removing data center equipment?<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-25\">3. What equipment should be included in a decommissioning assessment?<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-26\">4. How should organizations track equipment during decommissioning?<\/a><\/li><li class=\"rtoc-item\"><a href=\"#rtoc-27\">5. What happens to IT equipment after a data center is decommissioned?<\/a><\/li><\/ul><\/li><\/ul><\/div><h2 id=\"rtoc-1\" >Why Risk Assessment is Important for Businesses?<\/h2>\n<p>A data center shutdown can involve hundreds or thousands of assets, multiple stakeholders, sensitive data and interconnected systems. Removing equipment without assessing these first can create problems that can be quite costly. It\u2019s important to avoid problems later and follow a <a href=\"https:\/\/hummingbirdinternational.net\/blog\/data-destruction-security\/data-center-decommissioning-guide\/\" target=\"_blank\" rel=\"noopener\">guide to data center decommissioning<\/a> as well.<\/p>\n<h3 id=\"rtoc-2\" >Prevent Disruptions<\/h3>\n<p>Teams need to know what systems, applications, networks and services depend on it. Working out these dependencies helps prevent critical equipment from being removed when it is still needed.<\/p>\n<h3 id=\"rtoc-3\" >Protect Data Across Shutdown<\/h3>\n<p>Retired servers and storage devices sometimes contain sensitive information. Identifying devices with confidential details before removal is very important. It allows organizations to implement the appropriate data sanitization or destruction process.<\/p>\n<h3 id=\"rtoc-4\" >Asset Accountability<\/h3>\n<p>An accurate pre-removal assessment establishes what is actually in the facility, who owns it, its condition and the next steps for <a href=\"https:\/\/hummingbirdinternational.net\/it-asset-disposal-and-disposition-itad-services\/\">IT asset disposal<\/a>. This creates a reliable transparency check to match against later once equipment has been removed.<\/p>\n<h3 id=\"rtoc-5\" >Less Removal and Safety Risks<\/h3>\n<p>Equipment size, weight, power connections, batteries, access routes, loading areas and other site conditions can affect hardware safety. Highlighting these requirements in advance helps teams prepare the right people, equipment and procedures.<\/p>\n<h3 id=\"rtoc-6\" >Protect Asset Value<\/h3>\n<p>Not every retired device belongs in a recycling stream. Assessing equipment before removal can help categorize assets suitable for reuse, resale or refurbishment. This makes it easier for businesses to recover value from infrastructure they no longer need.<\/p>\n<h3 id=\"rtoc-7\" >Documentation from Scratch<\/h3>\n<p>A documented assessment gives IT, security, facilities, finance and the decommissioning provider a shared understanding of what needs to happen. It also establishes the information needed to track assets through transportation and final disposition.<\/p>\n<p>The objective is simple, know what you have, understand the risks and secure what matters. It helps define the next step for every asset before removal begins.<\/p>\n<h2 id=\"rtoc-8\" >12 Things IT Teams Should Verify Before Removing Equipment<\/h2>\n<p>When working on this process, IT teams need to verify more than just how a device is ready for retirement. A thorough risk assessment helps identify potential data, security, operational, compliance and disposal risks before equipment leaves the facility.<\/p>\n<p>The following checklist covers 12 key areas to review.<\/p>\n<h3 id=\"rtoc-9\" >1. Complete and Check IT Asset Inventory<\/h3>\n<p>Confirm exactly which equipment is scheduled for decommissioning.<\/p>\n<p>Physical equipment should be matched against asset records to prevent errors or accidental removal. This way, you avoid putting out devices that may still be required in use.<\/p>\n<div align=\"center\">\n<table cellspacing=\"0\">\n<colgroup>\n<col width=\"40%\">\n<col width=\"60%\">\n    <\/colgroup>\n<tbody>\n<tr>\n<td class=\"hd\">Asset information<\/td>\n<td class=\"hd\">What to verify<\/td>\n<\/tr>\n<tr>\n<td>Asset tag<\/td>\n<td>Matches inventory records<\/td>\n<\/tr>\n<tr>\n<td>Serial number<\/td>\n<td>Correct and documented<\/td>\n<\/tr>\n<tr>\n<td>Equipment type<\/td>\n<td>Server, storage, network equipment, etc.<\/td>\n<\/tr>\n<tr>\n<td>Ownership<\/td>\n<td>Owned, leased, or third-party equipment<\/td>\n<\/tr>\n<tr>\n<td>Condition<\/td>\n<td>Working, damaged, or obsolete<\/td>\n<\/tr>\n<tr>\n<td>Final disposition<\/td>\n<td>Reuse, resale, recycling, return, or destruction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>&nbsp;<\/p>\n<h4>Before Removal, IT Teams Should:<\/h4>\n<ul>\n<li>Reconcile physical assets with the CMDB or asset register.<\/li>\n<li>Identify missing or unregistered equipment.<\/li>\n<li>Confirm ownership and disposition requirements.<\/li>\n<li>Photograph or document assets where appropriate.<\/li>\n<\/ul>\n<h3 id=\"rtoc-10\" >2. Identify Data\/Retention Requirements<\/h3>\n<p>Determine what data is stored on each device and if it must be retained or destroyed. Sometimes, confidential information will have to be relocated or backed up.<\/p>\n<p>Verify applicable data-retention policies, legal requirements, customer obligations and internal governance standards. You may find details that only need to be retained for a specific period. Other data has to be securely destroyed once it is no longer required.<\/p>\n<h3 id=\"rtoc-11\" >3. Verify Data Erasure and Sanitization<\/h3>\n<p>Deleting files or formatting a drive is the first step towards removing confidential data. Storage devices should also go through an appropriate sanitization process based on the media type and sensitivity of the information.<\/p>\n<div align=\"center\">\n<table cellspacing=\"0\">\n<colgroup>\n<col width=\"40%\">\n<col width=\"60%\">\n    <\/colgroup>\n<tbody>\n<tr>\n<td class=\"hd\">Storage media<\/td>\n<td class=\"hd\">Key consideration<\/td>\n<\/tr>\n<tr>\n<td>HDDs<\/td>\n<td>Secure erasure or physical destruction<\/td>\n<\/tr>\n<tr>\n<td>SSDs<\/td>\n<td>Use an appropriate SSD sanitization method<\/td>\n<\/tr>\n<tr>\n<td>Backup media<\/td>\n<td>Verify retention and destruction requirements<\/td>\n<\/tr>\n<tr>\n<td>Failed drives<\/td>\n<td>Consider controlled physical destruction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>&nbsp;<\/p>\n<p>Maintain all records showing which device was sanitized, when it was processed and how the data was destroyed.<\/p>\n<p><center><a class=\"cta btn ewaste-cta-btn\" href=\"https:\/\/hummingbirdinternational.net\/hard-drive-disposal\/?utm_source=data-center-decommissioning-risk-assessment&amp;utm_medium=referral&amp;utm_campaign=ctatracking&amp;utm_content=blogpost\" target=\"_blank\" rel=\"noopener\">Get Hardware Destruction<\/a><\/center><\/p>\n<h3 id=\"rtoc-12\" >4. Check Application and Infrastructure Dependencies<\/h3>\n<p>An apparently obsolete server may still support applications, databases, authentication services, monitoring platforms or other infrastructure.<\/p>\n<p>Before disconnecting equipment:<\/p>\n<ul>\n<li>Map application and system dependencies.<\/li>\n<li>Confirm workloads have been migrated or retired.<\/li>\n<li>Check production and non-production environments.<\/li>\n<li>Review legacy applications and services.<\/li>\n<li>Obtain appropriate shutdown approval.<\/li>\n<\/ul>\n<h3 id=\"rtoc-13\" >5. Review Network Connectivity Dependencies<\/h3>\n<p>Check network diagrams and configurations before disconnecting switches, routers, firewalls or other connectivity equipment. The ones no longer needed should be removed or updated where appropriate, but only after confirming their invalidity.<\/p>\n<p>Teams should also consider connectivity after equipment is turned off. This helps identify hidden dependencies before the decommissioning project is considered complete. Here are some aspects to consider:<\/p>\n<ul>\n<li>VLANs and IP addresses<\/li>\n<li>Routing dependencies<\/li>\n<li>Firewall rules<\/li>\n<li>Network cabling<\/li>\n<li>Inter-rack connections<\/li>\n<li>Monitoring and management connections<\/li>\n<\/ul>\n<h3 id=\"rtoc-14\" >6. Assess Power\/Cooling Infrastructure<\/h3>\n<p>Equipment removal can affect rack power, cooling, cable management and important electronics or devices.<\/p>\n<div align=\"center\">\n<table cellspacing=\"0\">\n<colgroup>\n<col width=\"40%\">\n<col width=\"60%\">\n    <\/colgroup>\n<tbody>\n<tr>\n<td class=\"hd\">Area<\/td>\n<td class=\"hd\">What to check<\/td>\n<\/tr>\n<tr>\n<td>Power<\/td>\n<td>PDU, UPS, and circuit connections<\/td>\n<\/tr>\n<tr>\n<td>Cooling<\/td>\n<td>Impact on surrounding equipment<\/td>\n<\/tr>\n<tr>\n<td>Cabling<\/td>\n<td>Connections that must remain active<\/td>\n<\/tr>\n<tr>\n<td>Racks<\/td>\n<td>Stability and remaining equipment<\/td>\n<\/tr>\n<tr>\n<td>Physical access<\/td>\n<td>Safe removal route<\/td>\n<\/tr>\n<tr>\n<td>Safety<\/td>\n<td>Electrical and lifting requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3 id=\"rtoc-15\" >7. Verify Security and Access Controls<\/h3>\n<p>Decommissioning should address both physical and logical access. Equipment containing sensitive information should remain under a controlled chain of custody specifically for data center decommissioning process, throughout removal and transportation.<\/p>\n<p>IT and security teams should review:<\/p>\n<ul>\n<li>Administrative accounts<\/li>\n<li>Service accounts<\/li>\n<li>Passwords and credentials<\/li>\n<li>Encryption keys<\/li>\n<li>Certificates<\/li>\n<li>Remote management access<\/li>\n<li>Physical access permissions<\/li>\n<\/ul>\n<h3 id=\"rtoc-16\" >8. Confirm Compliance or Regulatory Requirements<\/h3>\n<p>The decommissioning process may need to satisfy data protection, industry, environmental, contractual or internal requirements. Identify the requirements that apply to your organization and the data stored on the equipment.<\/p>\n<p>Teams should also know what evidence needs to be retained for internal audits, customers, regulators or other stakeholders. Working with e-waste pickup services can help organizations maintain appropriate documentation throughout the decommissioning lifecycle.<\/p>\n<div align=\"center\">\n<table cellspacing=\"0\">\n<colgroup>\n<col width=\"40%\">\n<col width=\"60%\">\n    <\/colgroup>\n<tbody>\n<tr>\n<td class=\"hd\">Requirement<\/td>\n<td class=\"hd\">Verification<\/td>\n<\/tr>\n<tr>\n<td>Data protection<\/td>\n<td>Applicable privacy requirements<\/td>\n<\/tr>\n<tr>\n<td>Data destruction<\/td>\n<td>Approved sanitization process<\/td>\n<\/tr>\n<tr>\n<td>Documentation<\/td>\n<td>Required records and certificates<\/td>\n<\/tr>\n<tr>\n<td>Environmental<\/td>\n<td>Appropriate recycling\/disposal<\/td>\n<\/tr>\n<tr>\n<td>Contracts<\/td>\n<td>Customer or vendor obligations<\/td>\n<\/tr>\n<tr>\n<td>Auditing<\/td>\n<td>Evidence needed for compliance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>&nbsp;<\/p>\n<p><strong>Learn more:<\/strong> <a href=\"https:\/\/hummingbirdinternational.net\/blog\/compliance-regulations\/e-waste-compliance-for-businesses\/\">IT Compliance and E-Waste Regulations<\/a><\/p>\n<h3 id=\"rtoc-17\" >9. Establish Asset Disposal and Chain-of-Custody Procedures<\/h3>\n<p>Once equipment leaves the data center, organizations should know where it goes and who is responsible for it.<\/p>\n<p>Possible disposal channels include:<\/p>\n<ul>\n<li>Internal reuse<\/li>\n<li>Refurbishment<\/li>\n<li>Resale<\/li>\n<li>Vendor return<\/li>\n<li>Recycling<\/li>\n<li>Secure destruction<\/li>\n<\/ul>\n<p>Maintain a <a href=\"https:\/\/hummingbirdinternational.net\/blog\/data-destruction-security\/chain-of-custody-data-center-decommissioning\/\" target=\"_blank\" rel=\"noopener\">chain-of-custody record from data center<\/a> removal through final disposal channel or method.<\/p>\n<h3 id=\"rtoc-18\" >10. Coordinate Vendors\/Third Parties<\/h3>\n<p>Some equipment may be leased, owned by a vendor, customer or third party. Review the relevant agreements before making disposition decisions. IT teams should go through contracts and determine if hardware needs to be returned, transferred or processed through an approved provider.<\/p>\n<p><center><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/hummingbirdinternational.net\/blog\/wp-content\/uploads\/2026\/10\/IT-Equipment-Ownership-Responsibility-Checks.jpg\" alt=\"IT Equipment Ownership Responsibility Checks\" title=\"IT Equipment Ownership Responsibility Checks\" width=\"1200\" height=\"600\" class=\"wp-image-4792\" srcset=\"https:\/\/hummingbirdinternational.net\/blog\/wp-content\/uploads\/2026\/10\/IT-Equipment-Ownership-Responsibility-Checks.jpg 1200w, https:\/\/hummingbirdinternational.net\/blog\/wp-content\/uploads\/2026\/10\/IT-Equipment-Ownership-Responsibility-Checks-300x150.jpg 300w, https:\/\/hummingbirdinternational.net\/blog\/wp-content\/uploads\/2026\/10\/IT-Equipment-Ownership-Responsibility-Checks-1024x512.jpg 1024w, https:\/\/hummingbirdinternational.net\/blog\/wp-content\/uploads\/2026\/10\/IT-Equipment-Ownership-Responsibility-Checks-768x384.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/center><\/p>\n<p>Any third-party service provider involved in transportation, data destruction, resale or <a href=\"https:\/\/hummingbirdinternational.net\/it-asset-recycling-itad-services\/\" target=\"_blank\" rel=\"noopener\">IT equipment recycling<\/a> should also be evaluated for compliance. Clear responsibilities should be established before equipment leaves the facility.<\/p>\n<h3 id=\"rtoc-19\" >11. Evaluate Business Continuity and Operational Risks<\/h3>\n<p>Removing redundant equipment can sometimes create new points of failure. It\u2019s important to verify that remaining infrastructure has sufficient capacity and resilience.<\/p>\n<p>Check failover capabilities, disaster recovery arrangements, backup systems and remaining capacity. They should confirm that the organization can continue operating if another component fails after the decommissioning project.<\/p>\n<h3 id=\"rtoc-20\" >12. Complete Final Inspection and Sign-Off<\/h3>\n<p>The final review confirms that the equipment was removed without leaving unresolved technical, security or compliance issues.<\/p>\n<p>Assess the final equipment list against the original inventory and verify that data sanitization has been completed. Documentation should then be updated, including asset records, CMDB entries, maintenance records, data destruction and disposal records.<\/p>\n<p>relevant stakeholders, such as IT operations, information security, facilities, compliance and business owners, should provide formal sign-off. This creates a clear record that the equipment was removed in a controlled manner.<\/p>\n<p>A final checklist should include:<\/p>\n<ul style=\"list-style: none;\">\n<li>\u2610 Asset inventory reconcile<\/li>\n<li>\u2610 Data securely sanitized<\/li>\n<li>\u2610 Dependencies removed<\/li>\n<li>\u2610 Accounts and credentials addressed<\/li>\n<li>\u2610 Equipment physically removed<\/li>\n<li>\u2610 Disposal or recycling completed<\/li>\n<li>\u2610 Required certificates obtained<\/li>\n<li>\u2610 IT and security records updated<\/li>\n<li>\u2610 Stakeholder sign-off completed<\/li>\n<\/ul>\n<h2 id=\"rtoc-21\" >Work on Your Data Center Decommissioning<\/h2>\n<p>A structured approach to this process helps make sure that every asset is properly accounted for from removal through its final disposition. This way, businesses also attain the documentation needed for security, compliance and operational accountability.<\/p>\n<p>If your organization is planning a data center decommissioning project, Hummingbird International can help manage the process from equipment removal and secure data destruction to responsible IT asset disposition and recycling. Contact Us to discuss your decommissioning requirements and build a secure, compliant equipment retirement plan.<\/p>\n<p><center><a class=\"cta btn ewaste-cta-btn\" href=\"https:\/\/hummingbirdinternational.net\/data-center-decommissioning\/?utm_source=data-center-decommissioning-risk-assessment&amp;utm_medium=referral&amp;utm_campaign=ctatracking&amp;utm_content=blogpost\" target=\"_blank\" rel=\"noopener\">Get a Data Center Decommissioning Quote<\/a><\/center><\/p>\n<h2 id=\"rtoc-22\" >Frequently Asked Questions (FAQs)<\/h2>\n<h3 id=\"rtoc-23\" >1. What is a data center decommissioning risk assessment?<\/h3>\n<p>It identifies potential security, data, operational, compliance and physical risks before IT equipment is removed from service.<\/p>\n<h3 id=\"rtoc-24\" >2. Why is data sanitization important before removing data center equipment?<\/h3>\n<p>Data sanitization helps make sure sensitive information cannot be recovered from retired storage devices. The appropriate method depends on the type of media and the sensitivity of the data.<\/p>\n<h3 id=\"rtoc-25\" >3. What equipment should be included in a decommissioning assessment?<\/h3>\n<p>Servers, hard drives, SSDs, storage systems, switches, routers, firewalls, racks, backup devices and other IT infrastructure scheduled for retirement.<\/p>\n<h3 id=\"rtoc-26\" >4. How should organizations track equipment during decommissioning?<\/h3>\n<p>Maintain an accurate asset inventory and document each item&#8217;s serial number, ownership, removal, chain of custody, data sanitization and final disposition.<\/p>\n<h3 id=\"rtoc-27\" >5. What happens to IT equipment after a data center is decommissioned?<\/h3>\n<p>Depending on its condition and ownership, equipment may be redeployed, refurbished or resold. It can also be returned to a vendor or leasing company, recycled, or securely destroyed. The appropriate disposition should be documented for each asset.<\/p>\n<p><script type=\"application\/ld+json\"> { \"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{ \"@type\": \"Question\", \"name\": \"What is a data center decommissioning risk assessment?\", \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"It identifies potential security, data, operational, compliance and physical risks before IT equipment is removed from service.\" } },{ \"@type\": \"Question\", \"name\": \"Why is data sanitization important before removing data center equipment?\", \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Data sanitization helps make sure sensitive information cannot be recovered from retired storage devices. The appropriate method depends on the type of media and the sensitivity of the data.\" } },{ \"@type\": \"Question\", \"name\": \"What equipment should be included in a decommissioning assessment?\", \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Servers, hard drives, SSDs, storage systems, switches, routers, firewalls, racks, backup devices and other IT infrastructure scheduled for retirement.\" } },{ \"@type\": \"Question\", \"name\": \"How should organizations track equipment during decommissioning?\", \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Maintain an accurate asset inventory and document each item's serial number, ownership, removal, chain of custody, data sanitization and final disposition.\" } },{ \"@type\": \"Question\", \"name\": \"What happens to IT equipment after a data center is decommissioned?\", \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Depending on its condition and ownership, equipment may be redeployed, refurbished or resold. It can also be returned to a vendor or leasing company, recycled, or securely destroyed. The appropriate disposition should be documented for each asset.\" } }] } <\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A data center decommissioning risk assessment identifies potential IT, security, asset, safety, and logistical risks before equipment is disconnected or removed. It verifies the asset inventory and documentation so the data center shutdown can proceed with accountability across all stages. The following 12-point assessment can be a good starting point for organizations planning a data [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4791,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false},"categories":[77],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/posts\/4790"}],"collection":[{"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/comments?post=4790"}],"version-history":[{"count":5,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/posts\/4790\/revisions"}],"predecessor-version":[{"id":4896,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/posts\/4790\/revisions\/4896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/media\/4791"}],"wp:attachment":[{"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/media?parent=4790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/categories?post=4790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hummingbirdinternational.net\/blog\/wp-json\/wp\/v2\/tags?post=4790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}